GPL-PD-050-2022 – Supply and Installation of Fire Fighting System at New 46.5 MW Power Plant – Garden of Eden-Garden of Eden
IFB NumberGPL-PD-050-2022
Bid Documents
GPL-PD-050-2022 - Supply and Installation of Fire Fighting System at New 46.5 MW Power Plant - Garden of Eden-Garden of Eden
ViewDownloadGPL-PD-050-2022 Attachment 6 Concrete Plinth and Pipe Support Details
ViewDownloadGPL-PD-050-2022 Attachment 4 Fire Protection SL Site Layout
ViewDownloadGPL-PD-050-2022 Attachment 3 Fire Protection SL Engine Hall
ViewDownload