ADDENDUM NO 1- GPL-PD-036-2021 – Supply and Installation of Fire Fighting System – New 46.5 MW Power Plant at Garden of Eden

IFB NumberGPL-PD-036-2021

Submission Status Closed

Bid Documents

GPL-PD-036-2021 - ADDENDUM NO 1

Download